After a few crazy months and a persnickety electrical inspector, we have rebounded, passed 3 inspections with flying colors, and are attacking the downstairs bathroom with renewed vigor. Here's what we've been up to...
(Insulated the Ceiling)
(Packed eight 4'x8' sheets of moisture resistant drywall into the Element--I love this car!)
(Closed up the wall b/w kitchen and BR; Put up new strapping on BR ceiling)
(Got the hang of cutting drywall)
(Drywalled the BR ceiling and 2 BR walls)
We aim to finish off the last 2 walls before we return to work on Monday...but also have a little R&R before then, too! Then it will be tile selection time...
No comments:
Post a Comment